Louisiana
Related: About this forumDeeper draft in Mississippi River means billions in revenue, 17,000 new jobs nationwide
With cargo ships getting larger and the Panama Canal getting wider, the U.S. Army Corps of Engineers is once again weighing the costs and benefits of a potential $300 million effort to deepen the lower Mississippi River by as much as 5 feet.
The project which would cover the stretch from Baton Rouge to the Gulf of Mexico is being considered largely in light of the multibillion-dollar work underway at the canal, which is slated to wrap up next year.
When the Panama project is finished, the canal will be able to accommodate ships with drafts as deep as 50 feet below the waters surface. That is 5 feet deeper than whats available on the lower Mississippi.
For years, local maritime officials have argued that the extra 5 feet of depth are overdue for the sinuous, 175-mile shipping waterway. In fact, Congress authorized the river to be dredged to 55 feet in the 1980s, 10 feet deeper than it is now. Each additional foot means more cargo that ships can carry, and that means more money.
Read more: http://theadvocate.com/news/neworleans/12444862-148/ahead-of-panama-canal-expansion
Sherman A1
(38,958 posts)I wonder what the cost would be in both dollars and impact to the environment?
Hoppy
(3,595 posts)Sherman A1
(38,958 posts)That I have questions on this?
Cheviteau
(383 posts)The Corps is going to deepen Ol'Muddy by 5ft. from Baton Rouge o the Gulf at a cost of $300,000,000? Perhaps $300m per mile. I didn't read the link, so the poster may have misprinted from the original news article.